PROJECT PORTFOLIO

COMMERCIAL

MILTON ELEMENTARY MIDDLE SCHOOL

By Keiland Construction | May 4, 2021

MILTON ELEMENTARY MILTON, LA

HURRICANE OFF ROAD

By Keiland Construction | May 4, 2021

HURRICANE OFF ROAD LAKE CHARLES, LA 5,100 SF | CUSTOMIZED PRE-ENGINEERED METAL BUILDING | COMPLEX EXTERIOR METAL WORK | SPECIALIZED CARPENTRY AND FINISHING | SPECIALIZED EPOXY FLOOR COATING | STATE OF THE ART LIGHTING SYSTEM

SPRINGHILL SUITES BY MARRIOT

By Keiland Construction | May 4, 2021

SPRINGHILL SUITES BY MARRIOT LAKE CHARLES, LA 72000 SQ FT | 5 STORY BUILDING | 108 GUEST ROOMS | FF&E INSTALLATION | GUEST LOUNGES | SWIMMING POOL | INDOOR SWIMMING POOL | LANDSCAPE IMPROVEMENTS | 7,500 SF CONFERENCE CENTER

CITY OF LAKE CHARLES-BUS TRANSIT STATION

By Keiland Construction | May 4, 2021

CITY OF LAKE CHARLES-BUS TRANSIT STATION LAKE CHARLES, LA 12800 SF | DEMOLITION AND RENOVATION OF 14″ CAST IN PLACE CONCRETE STRUCTURE | INTERIOR AND EXTERIOR RENOVATION | INSTALLATION OF SITE UTILITIES | ARCHITECTURAL BUS TRANSFER CANOPY | METAL STUD FRAMING AND BRICK VENEER | AUTOMATED ELECTRICAL AND MECHANICAL SYSTEM | CUSTOM WATER FEATURE |…

ST. NICHOLAS CENTER FOR CHILDREN-AUTISM CENTER

By Keiland Construction | May 4, 2021

ST. NICHOLAS CENTER FOR CHILDREN-AUTISM CENTER LAKE CHARLES, LA 12600 SF | DESIGN/BUILD | SELECTIVE DEMOLITION ON A PARTIALLY OPERATING FACILITY | NEW MECHANICAL, ELECTRICAL AND PLUMBING SYSTEM INSTALLED | NEW FINISHES, HARDWARE AND FLOORING | EXTERIOR RENOVATION

INDUSTRIAL

UNITED STATES AIR FORCE-TRANSFORMERS AWUB 13-0132

By Keiland Construction | May 4, 2021

UNITED STATES AIR FORCE-TRANSFORMERS AWUB 13-0132 BARKSDALE AFB AIR FORCE BASE, LA | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT & SUPERVISION | DISCONNECT & REMOVE EXISTING TRANSFORMER 2000 KVA, 12,470 VOLT/480Y/277 DELTA WYE OIL FILLED | INSPECT AND REPAIR CONCRETE PAD & FOUNDATION | CUSTOMIZE AND FABRICATE NEW TRANSFORMERS | INSTALL NEW TRANSFORMER 2000 KVA, 12,470…

USACE SEEPAGE REPAIR

By Keiland Construction | May 4, 2021

USACE SEEPAGE REPAIR NEW ORLEANS, LA 21,648 LINEAR FEET | CRACKS REPAIR BY INJECTING HYDROPHILIC URETHANE | SPALL REMOVAL AND REPAIR | SATURATED SURFACE DRY CONDITION | DAYTON SUPERIOR HD-50 REPAIR MORTAR

USACE STORM PROOFING-WESTMINSTER LINCOLNSHIRE PUMP STATION

By Keiland Construction | May 4, 2021

USACE STORM PROOFING-WESTMINSTER LINCOLNSHIRE PUMP STATION MARRERO, LA UPGRADED STRUCTURES TO WITHSTAND WIND RESISTANCE OF 160 MPH | 11’X11′ RAISED STRUCTURAL CONCRETE PLATFORM | INSTALLATION OF AUTOMATED BACKUP GENERATOR | FABRICATION AND INSTALLATION OF 20 TON DEFLECTOR PLATES INSTALLATION OF ANTI-MISSILE DAMPERS | ERECTION OF 50 TON WALLS | INSTALLATION OF WIND RATED STANDING SEAM…

USACE JSP-08A, STORM PROOFING INTERIOR PUMP STATION

By Keiland Construction | May 4, 2021

USACE JSP-08A, STORM PROOFING INTERIOR PUMP STATION JEFFERSON PARISH, LA | STRUCTURAL, MECHANICAL AND ELECTRICAL UPGRADES | INSTALLATION OF VENTILATION FANS | AUTOMATION OF EXISTING DAMPERS | INSTALLATION OF NEW AUTOMATIC LUBRICATORS | INSTALLATION OF NEW ELECTRIC ACTUATORS FOR VALVES | REINFORCEMENT OF TRASH RAKE MOTORS

USACE ATCHAFALAYA BASIN LEVEE ENLARGEMENT

By Keiland Construction | May 4, 2021

USACE ATCHAFALAYA BASIN LEVEE ENLARGEMENT ST. MARY PARISH, LA CLEARING & GRUBBING | SOIL TESTING | LIME SOIL AMENDMENT & SULPHUR SOIL AMENDMENT | INSTALLATION OF GEO-TEXTILE SEPARATOR | INSTALLATION OF 610 SURFACING | BORROW PIT DEVELOPMENT | EMBANKMENT | COMPACTED FILL & SURFACING | HYDROSEEDING & HYDROMULCHING | CONCRETE SCOUR PROTECTION

USACE LPV 149-MRL TIE IN

By Keiland Construction | May 4, 2021

USACE LPV 149-MRL TIE IN ST. BERNARD PARISH, LA LOCATED ON MISSISSIPPI RIVER LEVEE | REMOVE AND REPLACE 26 FT HIGH CONCRETE REINFORCED FLOODWALL | INSTALLATION OF 60 FT PZ27 SHEET PILES | INSTALLATION OF 110 FT H PILES | ASPHALT PAVING | CLEARING & GRUBBING | OVERTOPPING PROTECTION | STRADDLE ENLARGEMENT & FLOODWALL MODIFICATION…

USACE SETTLEMENT REMEDIATION-SEABROOK GATE FALL PROTECTION

By Keiland Construction | May 4, 2021

USACE SETTLEMENT REMEDIATION-SEABROOK GATE FALL PROTECTION NEW ORLEANS DISTRICT, LA DESIGN AND INSTALLATION OF FALL PROTECTION SYSTEMS

FORT POLK 50 METER POOL BATHHOUSE & ADMIN BUILDING

By Keiland Construction | May 4, 2021

FORT POLK 50 METER POOL BATHHOUSE & ADMIN BUILDING FORT POLK, LA DESIGN BUILD PROJECT | CONTROLLED ACCESS JOB SITE | VERTICAL CONSTRUCTION RENOVATION | COMPLETE INTERNAL AND EXTERIOR RENOVATION | NEW BUILDING ADDITION TO EXISTING BUILDING | NEW ELECTRICAL AND MECHANICAL SYSTEM | NEW DATA AND COMMUNICATION SYSTEM INSTALLED

BARKSDALE HANGER 1 REPLACEMENT (BLDG. 6604)

By Keiland Construction | May 4, 2021

BARKSDALE HANGER 1 REPLACEMENT (BLDG. 6604) BARKSDALE AFB AIR FORCE BASE, BARKSDALE, LA | 109,000 SF OF 3 PLY MODIFIED BITUMEN ROOF R5 | REMOVAL OF ASBESTOS PANEL ON PENTHOUSE | INSTALL NEW CARBON STEEL DRAIN LINES WITH PVC | DESIGN AND REPLACE ROOF DRAIN SYSTEM | REMOVAL AND CAPPING OF 17 GRAVITY FANS |…

MARINE PROJECTS

Israel LaFleur Upgrades & Improvements

By Keiland Construction | May 4, 2021

Israel LaFleur Upgrades & Improvements

APPLIED TURF SCIENCE

USACE TURF ESTABLISHMENT & REPAIR IDIQ TASK ORDERS

By Keiland Construction | May 4, 2021

USACE TURF ESTABLISHMENT & REPAIR IDIQ TASK ORDERS NEW ORLEANS DISTRICT, LA | SOIL INVESTIGATION, TESTING, ANALYSIS & AMENDMENT | GROUND PREPARATION | LEVEE REPAIR | SOIL COMPACTION | DRAINAGE IMPROVEMENTS | VEGETATIVE AND DEBRIS REMOVAL | HYDROSEEDING & HYDROMULCHING | SOD INSTALLATION | IRRIGATION

USACE SEABROOK RAMP REPAIR

By Keiland Construction | May 4, 2021

USACE SEABROOK RAMP REPAIR NEW ORLEANS, LA INSTALLATION AND REPAIR OF LEVEE EMBANKMENT | CONCRETE SURFACING | HYDROSEEDING AND HYDROMULCHING

CHENNAULT TAXIWAY RELOCATION

By Keiland Construction | May 3, 2021

CHENNAULT TAXIWAY RELOCATION LAKE CHARLES, LA HYDROMULCHING